Megasnet IDC - FSA
Megasnet IDC - FSA is an operational data center operated by Rede MegasNet in Feira De Santana, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Rede MegasNet |
| Address | Rua Ana Brandão, 315, Olhos D'água |
| Coordinates | -12.26902, -38.96162 |
| Website | redemegasnet.com.br |
Power and grid
| Power plants within 50 km | 160 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
|---|---|
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 25.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.3 °C (2001 to 2025) |
| Cooling degree days | 2,851 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.26 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low (<10%) (Bahia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Megasnet IDC - FSA?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Megasnet IDC - FSA?
Rede MegasNet.
Data centers near Feira De Santana
- TURBOZONE FEC01 3.5 km
- Centro de Processamento de Dados - UEFS 7.5 km · 0.7 MW
- Laboratório de Programação 7.8 km
- SENAI CIMATEC Ogbon Cimatec/Petrobras 94.8 km · 0.2 MW
- TASCOM TELECOMUNICAÇÕES LTDA 95.9 km
- Telxius Salvador DC 96.0 km
- Softdados IDC 96.3 km
- ITS Telecomunicacoes Datacenter LIZ 96.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.