Meta Bowling Green Data Center is a data center under construction in Waterville, United States. Our footprint estimate of its power is about 236 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Facility power | 236 MW (range 94 MW to 591 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,968,364 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 100,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.46547, -83.63894 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Bowling Green Data Center use?
We estimate the facility power at about 236 MW. Estimate from building footprint, low confidence.
What chips does Meta Bowling Green Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Data centers near Waterville
- Meta Bowling Green 10.1 km
- Amplex DC0 15.7 km
- Data center in Lambertville 38.0 km
- Microtronix Datacenter Ottoville 83.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.