Microsoft Narvik Norway
Microsoft Narvik Norway is a data center under construction operated by Nscale in Narvik, Norway. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Nscale |
| Users | Microsoft (likely) |
| Planned power | 124 MW by 2026-12-31 Epoch AI timeline projection. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| Investors | Aker ASA |
| Coordinates | 68.43838, 17.42720 (city level) |
Power and grid
| Grid carbon intensity | 28 g CO₂ per kWh (Norway, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99% |
| Industrial power price | EUR 0.097 per kWh (Norway, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 0.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.8 °C (2001 to 2025) |
| Cooling degree days | 2 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 1.99 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low (<10%) (Nordland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-07-01 | 0 | 0 | Land clearing and site prep begins at least as early as July 2023. |
| 2025-06-27 | 0 | 0 | Site prep continues for Buildings 1, 2, and 3. |
| 2025-08-01 | 0 | 0 | Building 1 starts to go up. |
| 2026-05-31 | 0 | 0 | Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time. |
| 2026-07-05 | 0 | 0 | Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time. |
| 2026-12-31 (projected) | 124 MW | 265,000 | We believe Buildings 1 and 2 will be fully operational by the end of H2 2026 |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Microsoft Narvik Norway use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft Narvik Norway?
The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.
Who operates Microsoft Narvik Norway?
Nscale. Reported users: Microsoft.
More Nscale data centers
- Start Campus Sines Data Campus Portugal
- Nscale Keflavik Iceland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.