Microsoft Narvik Norway

Microsoft Narvik Norway is a data center under construction operated by Nscale in Narvik, Norway. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorNscale
UsersMicrosoft (likely)
Planned power124 MW by 2026-12-31
Epoch AI timeline projection.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
InvestorsAker ASA
Coordinates68.43838, 17.42720 (city level)

Power and grid

Grid carbon intensity28 g CO₂ per kWh (Norway, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99%
Industrial power priceEUR 0.097 per kWh (Norway, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature0.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature25.8 °C (2001 to 2025)
Cooling degree days2 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy1.99 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow (<10%) (Nordland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-07-0100Land clearing and site prep begins at least as early as July 2023.
2025-06-2700Site prep continues for Buildings 1, 2, and 3.
2025-08-0100Building 1 starts to go up.
2026-05-3100Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.
2026-07-0500Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.
2026-12-31 (projected)124 MW265,000We believe Buildings 1 and 2 will be fully operational by the end of H2 2026

Source: Epoch AI Frontier Data Centers.

Satellite view

Questions

What chips does Microsoft Narvik Norway use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How clean is the power for Microsoft Narvik Norway?

The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.

Who operates Microsoft Narvik Norway?

Nscale. Reported users: Microsoft.