Midcon Recovery Solutions B3 Data Center
Midcon Recovery Solutions B3 Data Center is an operational data center operated by Midcon Recovery Solutions in Oklahoma City, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Midcon Recovery Solutions |
| Networks | 1 networks PeeringDB. |
| Address | 14400 BOGERT PARKWAY |
| Coordinates | 35.61718, -97.57230 |
| Website | midconrecoverysolutions.com |
Power and grid
| Nearest high-voltage substation | Lone Oak Substation, 138 kV, 3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Northwest Substation, 345 kV, 6.9 km away |
| HV substations within 10 km | 18 |
| Utility | Cimarron Electric Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Enogex Inc, intrastate pipeline, 1.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.0 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 46.6 °C (2001 to 2025) |
| Cooling degree days | 1,215 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.74 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Midcon Recovery Solutions B3 Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Lone Oak Substation (138 kV), about 3 km away. The local utility is Cimarron Electric Coop, in the SWPP balancing area.
How clean is the power for Midcon Recovery Solutions B3 Data Center?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Who operates Midcon Recovery Solutions B3 Data Center?
Midcon Recovery Solutions.
Data centers near Oklahoma City
- TierPoint Oklahoma City 11.7 km
- RACK59 Data Center 18.1 km
Sources
Correct this page or get the data