Data Center Directory

MSU-270

MSU-270 is an operational AI data center operated by Moscow State Univeristy in Moscow, Russia. No power figure is public for this site yet. Epoch AI estimates about 202 H100-equivalent AI chips.

Key facts

StatusOperational
OperatorMoscow State Univeristy
AI compute202 H100-equivalents
Chip count100
Largest reported cluster at this site (Epoch AI).
AddressMoscow, Russia
Coordinates55.75045, 37.61749

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature4.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.1 °C (2001 to 2025)
Cooling degree days86 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.8 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
MSU-2701002023-09-02

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How clean is the power for MSU-270?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Who operates MSU-270?

Moscow State Univeristy.

Data centers near Moscow

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.