MTN Ghana Tetteh Quarshie Switch Center
MTN Ghana Tetteh Quarshie Switch Center is an operational data center in Medina Estates, Ghana. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.6 MW (range 0.6 MW to 3.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,065 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 5.62582, -0.18140 |
Power and grid
| Nearest high-voltage substation | ECG Power Station "H" Achimota Bulk Supply Point, 161 kV, 3.3 km away (Electricity Company of Ghana) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pokuase Bulk Supply Point, 330 kV, 12.1 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.8 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 461 g CO₂ per kWh (Ghana, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 60.3%, hydro 34.8%, solar 2.5%, oil and other fossil 2.3%. Clean power: 37.4% |
Climate and water
| Average temperature | 26.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.7 °C (2001 to 2025) |
| Cooling degree days | 3,096 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.1 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Greater Accra) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MTN Ghana Tetteh Quarshie Switch Center use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
How close is MTN Ghana Tetteh Quarshie Switch Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is ECG Power Station "H" Achimota Bulk Supply Point (161 kV), about 3.3 km away.
How clean is the power for MTN Ghana Tetteh Quarshie Switch Center?
The grid in Ghana emits about 461 g CO₂ per kWh (2024). Largest sources: gas 60.3%, hydro 34.8%, solar 2.5%.
Data centers near Medina Estates
- ONIX Data Centre Accra 2.7 km
- K-Net Accra 3.2 km
- PAIX Accra 6.4 km
- National Data Centre 8.4 km
- IS Internet Solutions Ghana 8.4 km
- Digital Realty ACR2 - Accra 9.7 km
- Equinix AC1 - Accra 21.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.