Neom Hyper Scale Data Center is an operational data center in Duba, Saudi Arabia. Our footprint estimate of its power is about 10 MW.

Key facts

StatusOperational
Facility power10 MW (range 4 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 83,859 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates27.47443, 35.60269

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 800 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 380 kV, 15.1 km away
HV substations within 10 km1
Power plants within 50 km650 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity676 g CO₂ per kWh (Saudi Arabia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 63.3%, oil and other fossil 31.9%, solar 4.5%. Clean power: 4.8%

Climate and water

Average temperature26.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.4 °C (2001 to 2025)
Cooling degree days3,217 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy6.25 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayExtremely High (>80%) (Saudi Arabia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Neom Hyper Scale Data Center use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

How close is Neom Hyper Scale Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 800 m away.

How clean is the power for Neom Hyper Scale Data Center?

The grid in Saudi Arabia emits about 676 g CO₂ per kWh (2025). Largest sources: gas 63.3%, oil and other fossil 31.9%, solar 4.5%.