Nepustil TTR Reutlingen is an operational data center operated by Dr.-Ing. Nepustil & in Reutlingen, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Dr.-Ing. Nepustil & |
| Address | Gerhard-Kindler-Str. 8 |
| Coordinates | 48.49603, 9.13746 |
| Website | nepustil.net/internet.html#serverhousing |
Power and grid
| Nearest high-voltage substation | Umspannwerk West, 110 kV, 1.2 km away (FairNetz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Metzingen, 380 kV, 11.7 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 1.8 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.3 °C (2001 to 2025) |
| Cooling degree days | 109 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Nepustil TTR Reutlingen to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk West (110 kV), about 1.2 km away.
How clean is the power for Nepustil TTR Reutlingen?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Nepustil TTR Reutlingen?
Dr.-Ing. Nepustil &.
Data centers near Reutlingen
- Nepustil Brückenstr. Tübingen 5.6 km
- CMO Rechenzentrum Reutlingen 6.0 km
- Pronexon Datacenter 6.6 km
- ITENOS Stuttgart (STR2) 23.6 km
- euNetworks Colocation Stuttgart 23.8 km
- Nepustil Stuttgart Zettachring 10a 23.8 km
- ITENOS Stuttgart (STR1) 25.1 km
- EXA Edge DC Stuttgart 25.5 km
More Dr.-Ing. Nepustil & data centers
- Nepustil Brückenstr. Tübingen Germany
- Nepustil Stuttgart Zettachring 10a Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.