NeutraDC SNG-3
NeutraDC SNG-3 is an operational data center operated by NEUTRADC Singapore in Singapore, Singapore. Our footprint estimate of its power is about 35 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEUTRADC Singapore |
| Facility power | 35 MW (range 17 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,778 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 11 networks, 1 internet exchanges PeeringDB. |
| Also known as | Mapletree Sunview 1 · Equinix Singapore SG5 |
| Address | 8 Sunview Drive |
| Opened | 2018-07-13 |
| Coordinates | 1.31675, 103.70152 |
| Website | sg.neutradc.com |
Power and grid
| Nearest high-voltage substation | Upper Jurong 230kV Substation, 230 kV, 2.3 km away (SP Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 17 GW in 37 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 497 g CO₂ per kWh (Singapore, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 91.1%, bioenergy 2.8%, solar 2.7%, oil and other fossil 2.5%, coal 0.9%. Clean power: 5.5% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.59 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | NoData (Singapore) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NeutraDC SNG-3 use?
We estimate the facility power at about 35 MW. Estimate from building footprint, low confidence.
How close is NeutraDC SNG-3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Upper Jurong 230kV Substation (230 kV), about 2.3 km away.
How clean is the power for NeutraDC SNG-3?
The grid in Singapore emits about 497 g CO₂ per kWh (2025). Largest sources: gas 91.1%, bioenergy 2.8%, solar 2.7%.
Who operates NeutraDC SNG-3?
NEUTRADC Singapore.
Data centers near Singapore
- Equinix SG5 - Singapore 84 m
- Meta Singapore Data Center 167 m · 191 MW
- Keppel Data Centres | Keppel DC Singapore 5 345 m · 23 MW
- Equinix SG2 - Singapore 865 m
- Google Data Centre 1.1 km · 26 MW
- Equinix data center in Jurong Town 1.7 km · 1.1 MW
- Nxera DC West 2.4 km · 68 MW
- Singtel DC West 2.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.