Newrays Two LLC Mining

Newrays Two LLC Mining is an operational data center in Paris, United States. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
Facility power0.9 MW (range 0.4 MW to 2.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,344 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.32703, -88.32007

Power and grid

UtilityCity Of Paris (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 15.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Newrays Two LLC Mining use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Newrays Two LLC Mining?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.