O2Switch DC2
O2Switch DC2 is an operational data center operated by O2Switch in Aubière, France. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | O2Switch |
| Facility power | 2.6 MW (range 1.3 MW to 4.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,167 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue des Sauzes 44 |
| Coordinates | 45.75664, 3.13474 |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 208 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does O2Switch DC2 use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How clean is the power for O2Switch DC2?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates O2Switch DC2?
O2Switch.
Data centers near Aubière
- RTDC 363 m
- Centre Régional de Ressources Informatiques (CRRI) 2.1 km · 2.7 MW
- Datacenter IBO 3.1 km · 1.7 MW
- Datacenter IBM 5.7 km · 4.2 MW
- Nexeren CBZ 8.4 km · 0.9 MW
- DC Free 8.5 km · 1.5 MW
- Datacenter IBM 8.9 km · 2.3 MW
- MXTL1 53.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.