Office of the System Administrator is an operational data center in Tacloban, Philippines. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates11.24716, 125.00812

Power and grid

Power plants within 50 km807 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity569 g CO₂ per kWh (Philippines, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27%

Climate and water

Average temperature26.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.6 °C (2001 to 2025)
Cooling degree days3,192 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Philippines)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Office of the System Administrator?

The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.

Data centers near Tacloban

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.