Parc d'activités économiques Vaux-sur-Sûre - Nives (ZAEM)) is an operational data center operated by IDELUX in Bastogne, Belgium. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IDELUX |
| Facility power | 22 MW (range 8.7 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 181,886 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 49.94030, 5.60158 |
| Website | idelux.be/fr/parc-dactivites-economiques-vaux-sur-sure-nives |
Power and grid
| Nearest high-voltage substation | Villeroux, 220 kV, 5.9 km away (Elia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.4 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 68 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.04 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Parc d'activités économiques Vaux-sur-Sûre - Nives (ZAEM)) use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
How close is Parc d'activités économiques Vaux-sur-Sûre - Nives (ZAEM)) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Villeroux (220 kV), about 5.9 km away.
How clean is the power for Parc d'activités économiques Vaux-sur-Sûre - Nives (ZAEM))?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Parc d'activités économiques Vaux-sur-Sûre - Nives (ZAEM))?
IDELUX.
Data centers near Bastogne
- LuxConnect DC2 - Bissen 38.7 km
- EuroHPC MeluXina 39.0 km · 0.7 MW
- DEEP Resilience Centre Luxembourg West 41.3 km · 4.6 MW
- C2D 41.7 km
- BCE Colocation Luxembourg 52.5 km
- European Business Reliance Centre (EBRC) 54.0 km
- Portus LUX1 54.2 km
- SecureIT DCC 54.4 km
Sources