Petrobras Pegasus (Pégaso)

Petrobras Pegasus (Pégaso) is an operational AI data center operated by Petrobras in Rio de Janeiro, Brazil. Its power is about 1.8 MW. Epoch AI estimates about 636 H100-equivalent AI chips (NVIDIA V100, NVIDIA A100).

Key facts

StatusOperational
OperatorPetrobras
Facility power1.8 MW
Reported (Epoch AI or owner data)
AI compute636 H100-equivalents
AI chipsNVIDIA V100, NVIDIA A100
Reported (Epoch AI or owner data)
Chip count2,176
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 770 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRio de Janeiro, Brazil
Coordinates-22.90953, -43.20993

Power and grid

Nearest high-voltage substationSubestação Frei Caneca, 138 kV, 1.4 km away (Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação Grajaú, 500 kV, 5.9 km away
HV substations within 10 km28
Power plants within 50 km2.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature23.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days2,007 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.7 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow (<10%) (Rio de Janeiro)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Petrobras Fênix Phase 1NVIDIA V1005760.5 MW2019-06-01
Petrobras AtlasNVIDIA V1001,0881 MW2020-06-01
Petrobras Fênix Phase 2NVIDIA V1007200.7 MW2020-06-01
Petrobras DragãoNVIDIA V1002,1761.7 MW2021-06-01
Petrobras Pegasus (Pégaso)NVIDIA A1002,0161.8 MW2022-11-01
Petrobras GaiaNVIDIA A1007041 MW2023-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Petrobras Pegasus (Pégaso) use?

Public data puts the facility power at about 1.8 MW. Reported (Epoch AI or owner data).

What chips does Petrobras Pegasus (Pégaso) use?

Reported chips: NVIDIA V100, NVIDIA A100.

How close is Petrobras Pegasus (Pégaso) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Frei Caneca (138 kV), about 1.4 km away.

How clean is the power for Petrobras Pegasus (Pégaso)?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates Petrobras Pegasus (Pégaso)?

Petrobras.