Petrobras Pegasus (Pégaso)
Petrobras Pegasus (Pégaso) is an operational AI data center operated by Petrobras in Rio de Janeiro, Brazil. Its power is about 1.8 MW. Epoch AI estimates about 636 H100-equivalent AI chips (NVIDIA V100, NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Petrobras |
| Facility power | 1.8 MW Reported (Epoch AI or owner data) |
| AI compute | 636 H100-equivalents |
| AI chips | NVIDIA V100, NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 2,176 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rio de Janeiro, Brazil |
| Coordinates | -22.90953, -43.20993 |
Power and grid
| Nearest high-voltage substation | Subestação Frei Caneca, 138 kV, 1.4 km away (Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Grajaú, 500 kV, 5.9 km away |
| HV substations within 10 km | 28 |
| Power plants within 50 km | 2.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 23.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 2,007 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low (<10%) (Rio de Janeiro) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Petrobras Fênix Phase 1 | NVIDIA V100 | 576 | 0.5 MW | 2019-06-01 |
| Petrobras Atlas | NVIDIA V100 | 1,088 | 1 MW | 2020-06-01 |
| Petrobras Fênix Phase 2 | NVIDIA V100 | 720 | 0.7 MW | 2020-06-01 |
| Petrobras Dragão | NVIDIA V100 | 2,176 | 1.7 MW | 2021-06-01 |
| Petrobras Pegasus (Pégaso) | NVIDIA A100 | 2,016 | 1.8 MW | 2022-11-01 |
| Petrobras Gaia | NVIDIA A100 | 704 | 1 MW | 2023-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Petrobras Pegasus (Pégaso) use?
Public data puts the facility power at about 1.8 MW. Reported (Epoch AI or owner data).
What chips does Petrobras Pegasus (Pégaso) use?
Reported chips: NVIDIA V100, NVIDIA A100.
How close is Petrobras Pegasus (Pégaso) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Frei Caneca (138 kV), about 1.4 km away.
How clean is the power for Petrobras Pegasus (Pégaso)?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Petrobras Pegasus (Pégaso)?
Petrobras.
Data centers near Rio de Janeiro
- Teleporto Rio de Janeiro 571 m
- BR.Digital Rio de Janeiro (RJO3) 745 m
- Cirion Rio de Janeiro - RIO1 965 m
- Data Center Rio 1.2 km
- PIX Embratel RJ 2.4 km
- Tecto TGIG2 (ex Arcos) 2.8 km
- JL TELECOM 3.1 km
- Mundivox do Brasil 3.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.