Data Center Directory

Phase3Telecom

Phase3Telecom is an operational data center operated by Phase3 Telecom in Abuja, Nigeria. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorPhase3 Telecom
Address4 Yedseram Street, Maitama
Coordinates9.09315, 7.49508
Websitephase3telecom.com

Power and grid

Grid carbon intensity425 g CO₂ per kWh (Nigeria, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 63.5%, hydro 29.4%, solar 7%. Clean power: 36.5%

Climate and water

Average temperature25.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days2,873 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.29 kWh per m² per day
Wind at 50 m3.6 m/s average
Water stress todayLow (<10%) (Nigeria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Phase3Telecom?

The grid in Nigeria emits about 425 g CO₂ per kWh (2025). Largest sources: gas 63.5%, hydro 29.4%, solar 7%.

Who operates Phase3Telecom?

Phase3 Telecom.

Data centers near Abuja

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.