Phase3Telecom
Phase3Telecom is an operational data center operated by Phase3 Telecom in Abuja, Nigeria. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Phase3 Telecom |
| Address | 4 Yedseram Street, Maitama |
| Coordinates | 9.09315, 7.49508 |
| Website | phase3telecom.com |
Power and grid
| Grid carbon intensity | 425 g CO₂ per kWh (Nigeria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 63.5%, hydro 29.4%, solar 7%. Clean power: 36.5% |
Climate and water
| Average temperature | 25.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.5 °C (2001 to 2025) |
| Cooling degree days | 2,873 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.29 kWh per m² per day |
| Wind at 50 m | 3.6 m/s average |
| Water stress today | Low (<10%) (Nigeria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Phase3Telecom?
The grid in Nigeria emits about 425 g CO₂ per kWh (2025). Largest sources: gas 63.5%, hydro 29.4%, solar 7%.
Who operates Phase3Telecom?
Phase3 Telecom.
Data centers near Abuja
- Medallion Abuja 3.1 km
- Galaxy Backbone NSSC-Abuja 3.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.