PHOCEA DC-M1
PHOCEA DC-M1 is an operational data center operated by PHOCEA DC in Marseille, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PHOCEA DC |
| Networks | 3 networks PeeringDB. |
| Also known as | Phocea DC |
| Address | 23 traverse du Moulin Villette |
| Coordinates | 43.31163, 5.37515 |
| Website | phocea-dc.com |
Power and grid
| Nearest high-voltage substation | Poste électrique Belle-de-Mai, 225 kV, 1.1 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 3.2 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41 °C (2001 to 2025) |
| Cooling degree days | 591 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is PHOCEA DC-M1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique Belle-de-Mai (225 kV), about 1.1 km away.
How clean is the power for PHOCEA DC-M1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates PHOCEA DC-M1?
PHOCEA DC.
Data centers near Marseille
- Digital Realty Marseille MRS1/2/3/4 138 m · 25 MW
- Marseille St-Mauront 401 m · 7 MW
- Marseille Nedelec 983 m
- Verizon Marseille 3.1 km · 1.1 MW
- EXA Edge DC Marseille 3.5 km · 2.2 MW
- Digital Realty MRS3 3.8 km · 32 MW
- Datacenter Sud 4.0 km
- Free Pro - Marseille - MRS1 6.1 km