Pixelpark GmbH Colo II Berlin
Pixelpark GmbH Colo II Berlin is an operational data center operated by Digitas Pixelpark in Berlin, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Digitas Pixelpark |
| Networks | 106 networks, 5 internet exchanges PeeringDB. |
| Also known as | CarrierColo Berlin Luetzow (I/P/B/ site B) · DNS:NET Colo I Berlin · IPB Internet Provider in Berlin GmbH |
| Address | Lützowstrasse 105/106 |
| Coordinates | 52.50192, 13.36945 |
| Website | pixelpark.com |
Power and grid
| Nearest high-voltage substation | Umspannwerk Mitte, 380 kV, 200 m away (50Hertz Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 92 |
| Power plants within 50 km | 3.2 GW in 52 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 209 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Pixelpark GmbH Colo II Berlin to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Mitte (380 kV), about 200 m away.
How clean is the power for Pixelpark GmbH Colo II Berlin?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Pixelpark GmbH Colo II Berlin?
Digitas Pixelpark.
Data centers near Berlin
- Speedbone Berlin 4.0 km · 0.9 MW
- Umspannwerk Berlin 4.1 km
- Aleph Alpha alpha ONE 4.3 km · 0.4 MW
- AtlasEdge DC Berlin BER001 4.5 km · 73 MW
- Rechenzentrum BER01 5.2 km · 4.6 MW
- 3U Rechenzentrum Berlin 5.3 km
- Vodafone data center in Mariendorf 5.9 km
- Virtus 6.6 km · 7.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.