مخابرات مرکزی is an operational data center in Poldasht, Iran. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
Facility power1 MW (range 0.5 MW to 1.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 868 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known as۱۱۷خرابی تلفن ویا
Coordinates39.35043, 45.07265

Power and grid

Grid carbon intensity656 g CO₂ per kWh (Iran, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 73.3%, oil and other fossil 21.3%, hydro 3%, nuclear 1.4%, solar 0.6%. Clean power: 5.2%

Climate and water

Water stress todayExtremely High (>80%) (Iran)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does مخابرات مرکزی use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How clean is the power for مخابرات مرکزی?

The grid in Iran emits about 656 g CO₂ per kWh (2025). Largest sources: gas 73.3%, oil and other fossil 21.3%, hydro 3%.