Prime Data Centers - Saeby Campus AAL01

Prime Data Centers - Saeby Campus AAL01 is an operational data center operated by Prime Data Centers in Sæby, Denmark. Our footprint estimate of its power is about 3.2 MW.

Key facts

StatusOperational
OperatorPrime Data Centers
Facility power3.2 MW (range 1.6 MW to 5.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,653 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates57.31865, 10.50074
Websiteprimedatacenters.com/locations/saeby

Power and grid

Nearest high-voltage substation150/60kV Dybvad, 150 kV, 8.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJævnstrømsstation Vester Hassing, 400 kV, 37.7 km away
HV substations within 10 km1
Power plants within 50 km498 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity120 g CO₂ per kWh (Denmark, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2%
Industrial power priceEUR 0.118 per kWh (Denmark, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature26.3 °C (2001 to 2025)
Cooling degree days27 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.86 kWh per m² per day
Wind at 50 m8.3 m/s average
Water stress todayLow (<10%) (Denmark)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Prime Data Centers - Saeby Campus AAL01 use?

We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.

How close is Prime Data Centers - Saeby Campus AAL01 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 150/60kV Dybvad (150 kV), about 8.1 km away.

How clean is the power for Prime Data Centers - Saeby Campus AAL01?

The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.

Who operates Prime Data Centers - Saeby Campus AAL01?

Prime Data Centers.