Pure DC SJK01 is an operational data center operated by Pure Data Centres in Seinäjoki, Finland. Our footprint estimate of its power is about 44 MW.

Key facts

StatusOperational
OperatorPure Data Centres
Facility power44 MW (range 18 MW to 110 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 365,648 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 19,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates62.72123, 22.88540

Power and grid

Nearest high-voltage substationKärmeskytö sähköasema, 110 kV, 700 m away (Seiverkot)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSeinäjoen sähköasema, 400 kV, 11.3 km away
HV substations within 10 km10
Power plants within 50 km283 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature3.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.2 °C (2001 to 2025)
Cooling degree days25 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.47 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Pure DC SJK01 use?

We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.

How close is Pure DC SJK01 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kärmeskytö sähköasema (110 kV), about 700 m away.

How clean is the power for Pure DC SJK01?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates Pure DC SJK01?

Pure Data Centres.

Data centers near Seinäjoki

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.