Data Center Directory

Pusdatin Unpatti

Pusdatin Unpatti is an operational data center operated by Universitas Pattimura in Ambon, Indonesia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorUniversitas Pattimura
Coordinates-3.65432, 128.19450

Power and grid

Nearest high-voltage substationGardu Induk Wayame, 150 kV, 3.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km30 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity705 g CO₂ per kWh (Indonesia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8%

Climate and water

Average temperature26.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.6 °C (2001 to 2025)
Cooling degree days3,060 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5 kWh per m² per day
Wind at 50 m3.4 m/s average
Water stress todayMedium - High (20-40%) (Maluku)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Pusdatin Unpatti to the power grid?

The nearest high-voltage substation in OpenStreetMap is Gardu Induk Wayame (150 kV), about 3.9 km away.

How clean is the power for Pusdatin Unpatti?

The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.

Who operates Pusdatin Unpatti?

Universitas Pattimura.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.