Quad State Internet METRO1 Colocation
Quad State Internet METRO1 Colocation is an operational data center operated by Quad State Internet in Metropolis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Quad State Internet |
| Networks | 1 networks PeeringDB. |
| Address | 506 Market Street |
| Coordinates | 37.15182, -88.73232 |
| Website | quadstateinternet.net |
Power and grid
| Nearest high-voltage substation | Shawnee Station, 500 kV, 4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | City Of Metropolis Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Trunkline Gas Co, interstate pipeline, 17.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.7 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.5 °C (2001 to 2025) |
| Cooling degree days | 894 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.21 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Quad State Internet METRO1 Colocation to the power grid?
The nearest high-voltage substation in OpenStreetMap is Shawnee Station (500 kV), about 4 km away. The local utility is City Of Metropolis, in the MISO balancing area.
How clean is the power for Quad State Internet METRO1 Colocation?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Quad State Internet METRO1 Colocation?
Quad State Internet.
Data centers near Metropolis
- Riot Kentucky 7.4 km · 2.8 MW
- Quad State Internet PAH1 Colocation 10.8 km
More Quad State Internet data centers
- Quad State Internet PAH1 Colocation United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.