Data Center Directory

Quad State Internet METRO1 Colocation

Quad State Internet METRO1 Colocation is an operational data center operated by Quad State Internet in Metropolis, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorQuad State Internet
Networks1 networks
PeeringDB.
Address506 Market Street
Coordinates37.15182, -88.73232
Websitequadstateinternet.net

Power and grid

Nearest high-voltage substationShawnee Station, 500 kV, 4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
UtilityCity Of Metropolis
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineTrunkline Gas Co, interstate pipeline, 17.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.7 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days894 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.21 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Quad State Internet METRO1 Colocation to the power grid?

The nearest high-voltage substation in OpenStreetMap is Shawnee Station (500 kV), about 4 km away. The local utility is City Of Metropolis, in the MISO balancing area.

How clean is the power for Quad State Internet METRO1 Colocation?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Quad State Internet METRO1 Colocation?

Quad State Internet.

Data centers near Metropolis

More Quad State Internet data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.