Data Center Directory

RATP data center in Châtillon

RATP data center in Châtillon is an operational data center operated by RATP in Châtillon, France. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorRATP
Facility power2 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,700 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvenue Jean Jaurès 1
Coordinates48.80064, 2.30131

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does RATP data center in Châtillon use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

How clean is the power for RATP data center in Châtillon?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates RATP data center in Châtillon?

RATP.

Data centers near Châtillon

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.