RZO - Rechenzentrum Ostschweiz
RZO - Rechenzentrum Ostschweiz is an operational data center in Gais, Switzerland. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.7 MW (range 0.9 MW to 2.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,443 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Forren 8, 9056, Gais |
| Coordinates | 47.35746, 9.44983 |
Power and grid
| Nearest high-voltage substation | Unterwerk Gais, 110 kV, 0 m away (St.Gallisch-Appenzellische Kraftwerke AG (SAK)) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Montlingen, 220 kV, 9.9 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.5 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 8.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 95 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Low (<10%) (Appenzell Innerrhoden) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does RZO - Rechenzentrum Ostschweiz use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
How close is RZO - Rechenzentrum Ostschweiz to the power grid?
The nearest high-voltage substation in OpenStreetMap is Unterwerk Gais (110 kV), about 0 m away.
How clean is the power for RZO - Rechenzentrum Ostschweiz?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Data centers near Gais
- Rechenzentrum Ostschweiz 155 m
- UW Steinach 9.6 km
- Datacenter-Feldkirch 15.3 km
- Internet Group AG Datacenter 1 15.7 km
- LKW Kollokation TZ Eschen 17.5 km
- SupraNet Schaan 20.7 km
- Elektrizitäts- und Wasserwerk der Stadt Buchs 21.5 km
- ICT Center Vaduz 25.9 km
Sources
Correct this page or get the data