Salle technique Euronews
Salle technique Euronews is an operational data center operated by Euronews in Sainte-Foy-lès-Lyon, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Euronews |
| Coordinates | 45.73440, 4.81565 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 1.1 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Power plants within 50 km | 7.1 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 227 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.74 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Salle technique Euronews to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 1.1 km away.
How clean is the power for Salle technique Euronews?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Salle technique Euronews?
Euronews.
Data centers near Sainte-Foy-lès-Lyon
- SNCF data center in La Mulatière 1.1 km · 2.2 MW
- Datacenter RTE 1.5 km
- ETIX Lyon #1 2.2 km
- Lyon Sévigné 3.5 km
- UltraEdge Lyon-Venissieux 3.9 km · 4.2 MW
- Fiducial Cloud LYO1 4.1 km
- Orange Lyon Lumière - Centrale 4.4 km · 53 MW
- Colt Lyon 4.9 km
Sources