Satelitsko i multimedijsko središte Deanovec is an operational data center operated by Odašiljači i veze d.o.o. in Ivanić-Grad, Croatia. Our footprint estimate of its power is about 7.1 MW.

Key facts

StatusOperational
OperatorOdašiljači i veze d.o.o.
Facility power7.1 MW (range 2.8 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 58,987 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates45.70006, 16.47488

Power and grid

Nearest high-voltage substationTS 110/35 kV Ivanić-grad, 110 kV, 1.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationTS TE Sisak, 220 kV, 27.9 km away
HV substations within 10 km1
Power plants within 50 km734 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity159 g CO₂ per kWh (Croatia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 39.3%, wind 21.2%, gas 18.6%, solar 8.9%, bioenergy 6.8%. Clean power: 76.3%
Industrial power priceEUR 0.124 per kWh (Croatia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days425 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m3.8 m/s average
Water stress todayLow (<10%) (Croatia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Satelitsko i multimedijsko središte Deanovec use?

We estimate the facility power at about 7.1 MW. Estimate from building footprint, low confidence.

How close is Satelitsko i multimedijsko središte Deanovec to the power grid?

The nearest high-voltage substation in OpenStreetMap is TS 110/35 kV Ivanić-grad (110 kV), about 1.3 km away.

How clean is the power for Satelitsko i multimedijsko središte Deanovec?

The grid in Croatia emits about 159 g CO₂ per kWh (2025). Largest sources: hydro 39.3%, wind 21.2%, gas 18.6%.

Who operates Satelitsko i multimedijsko središte Deanovec?

Odašiljači i veze d.o.o..

Data centers near Ivanić-Grad

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.