Saudi Aramco Tuwaiq-1
Saudi Aramco Tuwaiq-1 is an operational AI data center operated by Saudi Aramco in Ad Dawādimī, Saudi Arabia. Its power is about 0.6 MW. Epoch AI estimates about 416 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Saudi Aramco |
| Facility power | 0.6 MW Reported (Epoch AI or owner data) |
| AI compute | 416 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 416 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 250 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Saudi Arabia |
| Coordinates | 23.38478, 44.65243 |
Power and grid
| Grid carbon intensity | 676 g CO₂ per kWh (Saudi Arabia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 63.3%, oil and other fossil 31.9%, solar 4.5%. Clean power: 4.8% |
Climate and water
| Average temperature | 25.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 2,963 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 6.26 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Extremely High (>80%) (Saudi Arabia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Saudi Aramco Tuwaiq-1 | NVIDIA H100 SXM5 80GB | 416 | 0.6 MW | 2024-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Saudi Aramco Tuwaiq-1 use?
Public data puts the facility power at about 0.6 MW. Reported (Epoch AI or owner data).
What chips does Saudi Aramco Tuwaiq-1 use?
Reported chips: NVIDIA H100 SXM5 80GB.
How clean is the power for Saudi Aramco Tuwaiq-1?
The grid in Saudi Arabia emits about 676 g CO₂ per kWh (2025). Largest sources: gas 63.3%, oil and other fossil 31.9%, solar 4.5%.
Who operates Saudi Aramco Tuwaiq-1?
Saudi Aramco.
More Saudi Aramco data centers
- Aramco Groq Inference Cluster Saudi Arabia
- Saudi Aramco Dammam-7 Saudi Arabia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.