SFN IA-Emery
SFN IA-Emery is an operational data center operated by South Front Networks in Mason City, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | South Front Networks |
| Networks | 5 networks PeeringDB. |
| Address | 16455 Lark Ave |
| Coordinates | 43.13269, -93.27891 |
| Website | southfront.io |
Power and grid
| Nearest high-voltage substation | Killdeer Substation, 345 kV, 3.8 km away (ITC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | Interstate Power And Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 4.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 725 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41 °C (2001 to 2025) |
| Cooling degree days | 406 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is SFN IA-Emery to the power grid?
The nearest high-voltage substation in OpenStreetMap is Killdeer Substation (345 kV), about 3.8 km away. The local utility is Interstate Power And Light Co, in the MISO balancing area.
How clean is the power for SFN IA-Emery?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates SFN IA-Emery?
South Front Networks.
Data centers near Mason City
- Router12 - Brick and Tile 6.8 km
- SFN MN-Albert Lea 56.3 km
- SFN IA-IowaFalls 64.2 km
More South Front Networks data centers
- SFN IA-Davenport United States
- SFN IA-IowaFalls United States
- SFN IA-Urbana United States
- SFN IA-Waterloo United States
- SFN IL-Peoria United States
- SFN MN-Albert Lea United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.