SiDi IARA

SiDi IARA is an operational AI data center operated by SiDi in São Paulo, Brazil. Its power is about 0.2 MW. Epoch AI estimates about 63 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorSiDi
Facility power0.2 MW
Reported (Epoch AI or owner data)
AI compute63 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count200
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 73 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSão Paulo, Brazil
Coordinates-23.55214, -46.64720

Power and grid

Nearest high-voltage substationSubestação Centro CTR, 230 kV, 1.7 km away (CTEEP)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km1.6 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature20.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.9 °C (2001 to 2025)
Cooling degree days1,094 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.53 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Brazil)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
SiDi IARANVIDIA A1002000.2 MW2021-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does SiDi IARA use?

Public data puts the facility power at about 0.2 MW. Reported (Epoch AI or owner data).

What chips does SiDi IARA use?

Reported chips: NVIDIA A100.

How close is SiDi IARA to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Centro CTR (230 kV), about 1.7 km away.

How clean is the power for SiDi IARA?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates SiDi IARA?

SiDi.