SLRC KMC
SLRC KMC is an operational data center operated by Khyber Medical College in Peshawar, Pakistan. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Khyber Medical College |
| Facility power | 0.6 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 475 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.99922, 71.48506 |
Power and grid
| Grid carbon intensity | 309 g CO₂ per kWh (Pakistan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 23.1%, gas 23%, solar 21.2%, coal 14.5%, nuclear 14.1%. Clean power: 60.9% |
Climate and water
| Water stress today | High (40-80%) (Pakistan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SLRC KMC use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How clean is the power for SLRC KMC?
The grid in Pakistan emits about 309 g CO₂ per kWh (2025). Largest sources: hydro 23.1%, gas 23%, solar 21.2%.
Who operates SLRC KMC?
Khyber Medical College.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.