Smart Village Data Center (B90)
Smart Village Data Center (B90) is an operational data center operated by Telecom Egypt in Giza, Egypt. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telecom Egypt |
| Networks | 19 networks, 1 internet exchanges PeeringDB. |
| Also known as | Regional Data Hub (RDH) |
| Address | B90, Smart Village,KM 28 Cairo-Alex Desert Road, |
| Coordinates | 30.06790, 31.02070 |
| Website | te.eg |
Power and grid
| Nearest high-voltage substation | Cairo West Substation, 500 kV, 5.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 9.3 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 559 g CO₂ per kWh (Egypt, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 76.3%, oil and other fossil 9.9%, hydro 6.1%, wind 4.1%, solar 3.5%. Clean power: 13.8% |
Climate and water
| Average temperature | 21.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.4 °C (2001 to 2025) |
| Cooling degree days | 1,937 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.71 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Extremely High (>80%) (Egypt) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Smart Village Data Center (B90) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Cairo West Substation (500 kV), about 5.3 km away.
How clean is the power for Smart Village Data Center (B90)?
The grid in Egypt emits about 559 g CO₂ per kWh (2025). Largest sources: gas 76.3%, oil and other fossil 9.9%, hydro 6.1%.
Who operates Smart Village Data Center (B90)?
Telecom Egypt.
Data centers near Giza
- CityNet Host 22.6 km
- Ramses Exchange 23.4 km
- NutroCloud 87.3 km
More Telecom Egypt data centers
- AUTO DATA Center Egypt
- Ramses Exchange Egypt
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.