Data Center Directory

SoftBank CHIE-2

SoftBank CHIE-2 is an operational AI data center operated by Softbank in Karuizawa, Japan. Its power is about 2.9 MW. Epoch AI estimates about 2,040 H100-equivalent AI chips (PEZY-SC2, NVIDIA Tesla V100 SXM2, NVIDIA V100, NVIDIA A100, NVIDIA A100 SXM4 80 GB, NVIDIA H100 SXM5 80GB, NVIDIA GH200).

Key facts

StatusOperational
OperatorSoftbank
Facility power2.9 MW
Reported (Epoch AI or owner data)
AI compute2,040 H100-equivalents
AI chipsPEZY-SC2, NVIDIA Tesla V100 SXM2, NVIDIA V100, NVIDIA A100, NVIDIA A100 SXM4 80 GB, NVIDIA H100 SXM5 80GB, NVIDIA GH200
Reported (Epoch AI or owner data)
Chip count10,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressJapan
Coordinates36.38649, 138.59223

Power and grid

Nearest high-voltage substation佐久変電所, 275 kV, 23.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km1.4 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature8.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.3 °C (2001 to 2025)
Cooling degree days212 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.79 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow - Medium (10-20%) (Nagano)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
JAMSTEC ZettaScaler-2.0 GyoukouPEZY-SC21,6000.3 MW2017-06-15
JAMSTEC ZettaScaler-2.2 GyoukouPEZY-SC210,0002.6 MW2017-11-15
Japanese Research Institute 1 Supercomputer 1NVIDIA Tesla V100 SXM28320.6 MW2019-06-01
SAKURA Internet 2019 V100 SupercomputerNVIDIA Tesla V100 SXM27680.5 MW2019-06-01
Preferred Networks MN-2NVIDIA V1001,0240.7 MW2019-07-30
Japan Atomic Energy Agency and Quantum and Radiological Science and Technology HPE SGI8600NVIDIA Tesla V100 SXM21,0880.7 MW2020-11-01
Japanese Research Institute 2 Supercomputer 1NVIDIA A1006240.5 MW2022-06-01
NEC Corp Japan SupercomputerNVIDIA A100 SXM4 80 GB9280.8 MW2023-07-24
Softbank SuperPODNVIDIA A1002,0481.7 MW2023-09-30
SoftBank CHIE-2NVIDIA H100 SXM5 80GB2,0402.9 MW2024-10-31
SoftBank CHIE-3NVIDIA H100 SXM5 80GB2,0402.9 MW2024-10-31
JCAHPC MiyabiNVIDIA GH2001,1201.6 MW2025-01-15

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does SoftBank CHIE-2 use?

Public data puts the facility power at about 2.9 MW. Reported (Epoch AI or owner data).

What chips does SoftBank CHIE-2 use?

Reported chips: PEZY-SC2, NVIDIA Tesla V100 SXM2, NVIDIA V100, NVIDIA A100, NVIDIA A100 SXM4 80 GB, NVIDIA H100 SXM5 80GB, NVIDIA GH200.

How close is SoftBank CHIE-2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 佐久変電所 (275 kV), about 23.2 km away.

How clean is the power for SoftBank CHIE-2?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates SoftBank CHIE-2?

Softbank.

Data centers near Karuizawa

More Softbank data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.