State of Montana Data Center
State of Montana Data Center is an operational data center operated by State of Montana in Miles City, United States. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | State of Montana |
| Facility power | 0.9 MW (range 0.5 MW to 1.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 780 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.40688, -105.82070 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 2.1 km away |
| HV substations within 10 km | 4 |
| Utility | Tongue River Electric Coop INC Electric retail service territory (HIFLD, US government). |
| Balancing authority | NWMT |
| Nearest gas pipeline | WBI Energy Transmission, interstate pipeline, 10.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 23 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 381 g CO₂ per kWh (Montana, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 35.6%, hydro 34.7%, wind 22.2%, gas 4.7%, solar 1.8%. Clean power: 58.8% |
| Industrial power price | USD 0.080 per kWh (Montana, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.3 °C (2001 to 2025) |
| Cooling degree days | 479 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.14 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Montana) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does State of Montana Data Center use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How close is State of Montana Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2 km away. The local utility is Tongue River Electric Coop INC, in the NWMT balancing area.
How clean is the power for State of Montana Data Center?
The grid in Montana emits about 381 g CO₂ per kWh (2025). Largest sources: coal 35.6%, hydro 34.7%, wind 22.2%.
Who operates State of Montana Data Center?
State of Montana.
Sources
Correct this page or get the data