Stellium Newcastle Campus
Stellium Newcastle Campus is an operational data center in Wallsend, United Kingdom. Our footprint estimate of its power is about 4.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.3 MW (range 1.7 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 36,225 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Cobalt Park Way 9, NE28 9EJ, Wallsend |
| Coordinates | 55.01713, -1.50393 |
| Website | stelliumdc.com |
Power and grid
| Nearest high-voltage substation | Tynemouth Substation, 275 kV, 800 m away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 2.4 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 23 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.77 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Stellium Newcastle Campus use?
We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.
How close is Stellium Newcastle Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tynemouth Substation (275 kV), about 800 m away.
How clean is the power for Stellium Newcastle Campus?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Wallsend
- Stellium 1 246 m
- Pulsant Newcastle NE-1 (Central) 8.0 km
- Reliance House 10.3 km
- DXC Wynyard Data Center 44.5 km · 34 MW
- Lumen Technologies data center in Middlesbrough 51.7 km
- Pulsant data center in Stockton-on-Tees 53.2 km
- Data center in Redcar 56.1 km