Data Center Directory

Stellium Newcastle Campus

Stellium Newcastle Campus is an operational data center in Wallsend, United Kingdom. Our footprint estimate of its power is about 4.3 MW.

Key facts

StatusOperational
Facility power4.3 MW (range 1.7 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 36,225 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCobalt Park Way 9, NE28 9EJ, Wallsend
Coordinates55.01713, -1.50393
Websitestelliumdc.com

Power and grid

Nearest high-voltage substationTynemouth Substation, 275 kV, 800 m away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
Power plants within 50 km2.4 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature23 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.77 kWh per m² per day
Wind at 50 m8 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Stellium Newcastle Campus use?

We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.

How close is Stellium Newcastle Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Tynemouth Substation (275 kV), about 800 m away.

How clean is the power for Stellium Newcastle Campus?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Wallsend

Sources

Correct this page or get the data