Sustainable Metal Cloud Singapore
Sustainable Metal Cloud Singapore is an operational AI data center operated by SMC - Sustainable Metal Cloud in Hillcrest Park, Singapore. Its power is about 1.5 MW. Epoch AI estimates about 1,024 H100-equivalent AI chips (NVIDIA A100, NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | SMC - Sustainable Metal Cloud |
| Facility power | 1.5 MW Reported (Epoch AI or owner data) |
| AI compute | 1,024 H100-equivalents |
| AI chips | NVIDIA A100, NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 1,024 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 620 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Singapore |
| Coordinates | 1.35162, 103.80805 |
Power and grid
| Nearest high-voltage substation | Kampong Java Substation 230kV, 230 kV, 5.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 19 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 497 g CO₂ per kWh (Singapore, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 91.1%, bioenergy 2.8%, solar 2.7%, oil and other fossil 2.5%, coal 0.9%. Clean power: 5.5% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.82 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | NoData (Singapore) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NSCC ASPIRE 2A Phase 1 | NVIDIA A100 | 256 | 0.2 MW | 2022-06-01 |
| NSCC ASPIRE 2A Phase 2 | NVIDIA A100 | 352 | 0.3 MW | 2022-11-01 |
| Sustainable Metal Cloud Singapore Phase 1 | NVIDIA H100 SXM5 80GB | 1,024 | 1.5 MW | 2024-05-30 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Sustainable Metal Cloud Singapore use?
Public data puts the facility power at about 1.5 MW. Reported (Epoch AI or owner data).
What chips does Sustainable Metal Cloud Singapore use?
Reported chips: NVIDIA A100, NVIDIA H100 SXM5 80GB.
How close is Sustainable Metal Cloud Singapore to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kampong Java Substation 230kV (230 kV), about 5.9 km away.
How clean is the power for Sustainable Metal Cloud Singapore?
The grid in Singapore emits about 497 g CO₂ per kWh (2025). Largest sources: gas 91.1%, bioenergy 2.8%, solar 2.7%.
Who operates Sustainable Metal Cloud Singapore?
SMC - Sustainable Metal Cloud.
Data centers near Hillcrest Park
- DODID Data Centre 4.6 km
- Singapore Polytechnic 5.8 km
- 1ASIA-Singapore 5.8 km
- PhoenixNAP SINGAPORE 6.5 km · 18 MW
- Equinix SG1 - Singapore 6.6 km · 68 MW
- STTGDC SIN4 6.9 km · 64 MW
- M1 MiWorld 7.1 km
- Singapore Open Exchange (SOX) 7.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.