Sweden 4k H100 Cluster
Sweden 4k H100 Cluster is an operational AI data center in Lycksele, Sweden. Its power is about 5.6 MW. Epoch AI estimates about 4,000 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.6 MW Reported (Epoch AI or owner data) |
| AI compute | 4,000 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 4,000 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Sweden |
| Coordinates | 64.96488, 17.67541 |
Power and grid
| Nearest high-voltage substation | Grundfors, 400 kV, 4.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 26 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 0.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.9 °C (2001 to 2025) |
| Cooling degree days | 5 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.27 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Low (<10%) (Sweden) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Sweden 4k H100 Cluster | NVIDIA H100 SXM5 80GB | 4,000 | 5.6 MW | 2025-01-14 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Sweden 4k H100 Cluster use?
Public data puts the facility power at about 5.6 MW. Reported (Epoch AI or owner data).
What chips does Sweden 4k H100 Cluster use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is Sweden 4k H100 Cluster to the power grid?
The nearest high-voltage substation in OpenStreetMap is Grundfors (400 kV), about 4.5 km away.
How clean is the power for Sweden 4k H100 Cluster?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.