Swift Networks Lagos
Swift Networks Lagos is an operational data center operated by Swift Networks in Lagos, Nigeria. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Swift Networks |
| Address | 31B SAKA TINUBU STREET, VICTORIA ISLAND |
| Coordinates | 6.42728, 3.42110 |
| Website | swiftng.com/products/enterpriseproducts?datacenter |
Power and grid
| Grid carbon intensity | 425 g CO₂ per kWh (Nigeria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 63.5%, hydro 29.4%, solar 7%. Clean power: 36.5% |
Climate and water
| Average temperature | 26.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.9 °C (2001 to 2025) |
| Cooling degree days | 3,035 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.59 kWh per m² per day |
| Wind at 50 m | 3.7 m/s average |
| Water stress today | Medium - High (20-40%) (Lagos) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Swift Networks Lagos?
The grid in Nigeria emits about 425 g CO₂ per kWh (2025). Largest sources: gas 63.5%, hydro 29.4%, solar 7%.
Who operates Swift Networks Lagos?
Swift Networks.
Data centers near Lagos
- Digital Realty Lagos (LOS1-2) 401 m
- Africa Data Centres, Lagos LOS1, Nigeria 2.0 km
- Broadbased Communications 3.3 km
- Cloud Exchange West Africa 3.3 km
- NCR-Marina 3.4 km
- OADC LOS1 - Lagos 8.5 km
- Equinix LG1/LG2 – Lagos, Lekki 18.6 km
- Rack Centre Lagos 19.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.