鲁南大数据中心

鲁南大数据中心 is an operational data center in Taozhuang, China. Our footprint estimate of its power is about 7.9 MW.

Key facts

StatusOperational
Facility power7.9 MW (range 3.2 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 66,184 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 3,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.82147, 117.34201

Power and grid

Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Water stress todayExtremely High (>80%) (Shandong)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does 鲁南大数据中心 use?

We estimate the facility power at about 7.9 MW. Estimate from building footprint, low confidence.

How clean is the power for 鲁南大数据中心?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.