TAS Sophia

TAS Sophia is an operational data center operated by TAS France in Antibes, France. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTAS France
Networks1 networks
PeeringDB.
AddressWorld Trade Center 1 - B7, 1300 route des Cretes, Sophia Antipolis
Coordinates43.62805, 7.03805

Power and grid

Nearest high-voltage substationPoste électrique de Mougins, 225 kV, 5.4 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km321 MW in 20 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36 °C (2001 to 2025)
Cooling degree days620 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.3 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is TAS Sophia to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Mougins (225 kV), about 5.4 km away.

How clean is the power for TAS Sophia?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates TAS Sophia?

TAS France.