TELEPOINT Montana
TELEPOINT Montana is an operational data center operated by Telepoint EOOD in Montana, Bulgaria. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telepoint EOOD |
| Networks | 5 networks PeeringDB. |
| Address | 78 Treti Mart blvd. |
| Coordinates | 43.40619, 23.22513 |
| Website | telepoint.bg |
Power and grid
| Grid carbon intensity | 275 g CO₂ per kWh (Bulgaria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 39%, coal 22.5%, solar 18.2%, hydro 6.7%, gas 4.9%. Clean power: 71.9% |
| Industrial power price | EUR 0.136 per kWh (Bulgaria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 12.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.5 °C (2001 to 2025) |
| Cooling degree days | 580 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.85 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low (<10%) (Montana) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for TELEPOINT Montana?
The grid in Bulgaria emits about 275 g CO₂ per kWh (2025). Largest sources: nuclear 39%, coal 22.5%, solar 18.2%.
Who operates TELEPOINT Montana?
Telepoint EOOD.
Data centers near Montana
- RAX 51.2 km
- TELEPOINT Sofia Centre 78.5 km
- ITD Network SA Access Colocation Center 79.5 km
- BTC Core Network Sofia 79.6 km
- Evolink Data Center Sofia 2 81.1 km · 0.7 MW
- ITD Network SA Core Colocation center 81.6 km
- S3 Company Ltd. 81.7 km
- Evolink Data Center Sofia 1 82.2 km
More Telepoint EOOD data centers
- TELEPOINT Sofia Centre Bulgaria
- TELEPOINT Sofia East Bulgaria
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.