Telia Carrier Austria data center in St. Pölten is an operational data center operated by Telia Carrier Austria in St. Pölten, Austria. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telia Carrier Austria |
| Facility power | 0.8 MW (range 0.4 MW to 1.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 650 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Herrmanngasse 11, 3100, St. Pölten |
| Coordinates | 48.18792, 15.61451 |
Power and grid
| Nearest high-voltage substation | Umspannwerk St. Pölten West, 110 kV, 1.4 km away (Netz NÖ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Pottenbrunn, 380 kV, 7 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.0 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 88 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.21 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telia Carrier Austria data center in St. Pölten use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Telia Carrier Austria data center in St. Pölten to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk St. Pölten West (110 kV), about 1.4 km away.
How clean is the power for Telia Carrier Austria data center in St. Pölten?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates Telia Carrier Austria data center in St. Pölten?
Telia Carrier Austria.
Data centers near St. Pölten
- Arelion Wien Süd 51.6 km
- EXA Edge DC Wien 51.7 km
- ITandTEL Voesendorf/Vienna 53.1 km
- Europlaza Vienna 53.4 km
- NTT Vienna1 Data Center (VIE1) 53.8 km
- B 54.0 km · 6.8 MW
- Vienna Twin Tower 54.3 km
- DATASIX Vienna (VIE1) 54.8 km
Sources