Telkom - Milimani Data Center - Nairobi is an operational data center operated by Telkom Kenya in Nairobi, Kenya. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telkom Kenya |
| Networks | 2 networks PeeringDB. |
| Address | Telkom Plaza, Ralph Bunch Road - Nairobi, Milimani DC - Bishop Road |
| Coordinates | -1.29017, 36.80529 |
| Website | telkom.co.ke/carrier-services/our-solutions/carrier-services-hosting |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 11.8 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Embakasi Sub-Station, 220 kV, 12.7 km away |
| Power plants within 50 km | 309 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 92 g CO₂ per kWh (Kenya, 2025) Average of all power made in the area. Ember. |
| Grid power mix | other renewables 42.1%, hydro 19.2%, wind 15.2%, solar 12.6%, oil and other fossil 9.1%. Clean power: 90.9% |
Climate and water
| Average temperature | 20.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.6 °C (2001 to 2025) |
| Cooling degree days | 966 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.66 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low (<10%) (Kenya) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Telkom - Milimani Data Center - Nairobi to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 11.8 km away.
How clean is the power for Telkom - Milimani Data Center - Nairobi?
The grid in Kenya emits about 92 g CO₂ per kWh (2025). Largest sources: other renewables 42.1%, hydro 19.2%, wind 15.2%.
Who operates Telkom - Milimani Data Center - Nairobi?
Telkom Kenya.
Data centers near Nairobi
- PAIX Nairobi 1.4 km
- Telkom - Telephone House - Nairobi 1.7 km
- SimbaNET Nairobi 6.3 km
- icolo.io Nairobi Two (NBO2) 9.1 km
- icolo.io Nairobi One (NBO1) 9.1 km
- iXAfrica NBOX1 (Nairobi X One) 10.4 km
- Africa Data Centres, Nairobi NBO1, Kenya 11.6 km
More Telkom Kenya data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.