Telmex
Telmex is an operational data center in Gustavo Adolfo Madero, Mexico. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 807 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 19.49060, -99.05474 |
Power and grid
| Nearest high-voltage substation | Madero, 230 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 2.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 13.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31 °C (2001 to 2025) |
| Cooling degree days | 20 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.57 kWh per m² per day |
| Wind at 50 m | 3.3 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telmex use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is Telmex to the power grid?
The nearest high-voltage substation in OpenStreetMap is Madero (230 kV), about 600 m away.
How clean is the power for Telmex?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Data centers near Gustavo Adolfo Madero
- ATC Edge CDMX/E2 9.8 km
- Centro Control de Energía 11.7 km
- Triara Mexico City 14.4 km
- ATC Edge CDMX/E1 17.4 km
- Centro de datos KIO MEX5 18.2 km · 23 MW
- KIO México 5 (MEX5) 18.4 km
- KIO México 2 (MEX2) 24.5 km
- KIO México 4 (MEX4) 25.1 km · 0.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.