Telmex is an operational data center in Gustavo Adolfo Madero, Mexico. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
Facility power1 MW (range 0.5 MW to 1.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 807 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates19.49060, -99.05474

Power and grid

Nearest high-voltage substationMadero, 230 kV, 600 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km12
Power plants within 50 km2.5 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature13.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31 °C (2001 to 2025)
Cooling degree days20 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.57 kWh per m² per day
Wind at 50 m3.3 m/s average
Water stress todayHigh (40-80%) (Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Telmex use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How close is Telmex to the power grid?

The nearest high-voltage substation in OpenStreetMap is Madero (230 kV), about 600 m away.

How clean is the power for Telmex?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.