Telus Kamloops Data Centre
Telus Kamloops Data Centre is an operational data center in North Kamloops, Canada. Our footprint estimate of its power is about 8.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.9 MW (range 4.4 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,408 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Bunker Road 1458 |
| Coordinates | 50.67714, -120.37743 |
Power and grid
| Nearest high-voltage substation | West Kamloops Substation, 138 kV, 600 m away (BC Hydro) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Valley View Substation, 230 kV, 6.7 km away |
| HV substations within 10 km | 8 |
| Utility | Bc Hydro (federal) Electric retail service territory (HIFLD, US government). |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 4.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.6 °C (2001 to 2025) |
| Cooling degree days | 51 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
| Water stress today | Low (<10%) (British Columbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telus Kamloops Data Centre use?
We estimate the facility power at about 8.9 MW. Estimate from building footprint, low confidence.
How close is Telus Kamloops Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Kamloops Substation (138 kV), about 600 m away. The local utility is Bc Hydro.
How clean is the power for Telus Kamloops Data Centre?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near North Kamloops
- Equinix KA1 - Kamloops 254 m · 16 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.