Tietokettu is an operational data center operated by Tietokettu in Lempäälä, Finland. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTietokettu
AddressPiiponraitti 1, 37500, Lempäälä
Coordinates61.31532, 23.75720
Websitetietokettu.net

Power and grid

Nearest high-voltage substationToijala sähköasema, 110 kV, 13.1 km away (Elenia)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationLavianvuoren sähköasema, 400 kV, 14.4 km away
Power plants within 50 km464 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature4.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.2 °C (2001 to 2025)
Cooling degree days38 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.47 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Tietokettu to the power grid?

The nearest high-voltage substation in OpenStreetMap is Toijala sähköasema (110 kV), about 13.1 km away.

How clean is the power for Tietokettu?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates Tietokettu?

Tietokettu.

Data centers near Lempäälä

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.