Tirana DataCom
Tirana DataCom is an operational data center operated by Albanian Telecommunications Union SH. P.K. in Kashar, Albania. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Albanian Telecommunications Union SH. P.K. |
| Networks | 2 networks PeeringDB. |
| Address | Rruga Industriale |
| Coordinates | 41.37010, 19.69834 |
| Website | atu.al |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 400 kV, 1.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 122 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 26 g CO₂ per kWh (Albania, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 89.4%, solar 10.6%. Clean power: 100% |
| Industrial power price | EUR 0.134 per kWh (Albania, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 17.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 835 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.4 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Extremely High (>80%) (Tirana) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Tirana DataCom to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 1.4 km away.
How clean is the power for Tirana DataCom?
The grid in Albania emits about 26 g CO₂ per kWh (2025). Largest sources: hydro 89.4%, solar 10.6%.
Who operates Tirana DataCom?
Albanian Telecommunications Union SH. P.K..
Data centers near Kashar
- One Albania 486 m
- RASH - ANIX 10.0 km
- Pronet DataCenter 10.9 km
- Datacenter Albania 11.7 km
- DC-T01 iHost.AL 12.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.