TOP Parque Cristal Los Palos Grandes is an operational data center operated by TOP COMUNICATIONS ESTEGIA C.A. in Caracas, Venezuela. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTOP COMUNICATIONS ESTEGIA C.A.
Networks3 networks, 1 internet exchanges
PeeringDB.
AddressAvenida Francisco de Miranda, Los Palos Grandes
Coordinates10.49769, -66.84328
Websitetopcomunications.com

Power and grid

Nearest high-voltage substationS/E El Convento, 230 kV, 3.2 km away (Corpoelec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km2.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity86 g CO₂ per kWh (Venezuela, 2024)
Average of all power made in the area. Ember.
Grid power mixhydro 91.1%, gas 4.5%, oil and other fossil 4.4%. Clean power: 91.1%

Climate and water

Average temperature24 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34 °C (2001 to 2025)
Cooling degree days2,360 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.48 kWh per m² per day
Wind at 50 m3.7 m/s average
Water stress todayMedium - High (20-40%) (Miranda)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is TOP Parque Cristal Los Palos Grandes to the power grid?

The nearest high-voltage substation in OpenStreetMap is S/E El Convento (230 kV), about 3.2 km away.

How clean is the power for TOP Parque Cristal Los Palos Grandes?

The grid in Venezuela emits about 86 g CO₂ per kWh (2024). Largest sources: hydro 91.1%, gas 4.5%, oil and other fossil 4.4%.

Who operates TOP Parque Cristal Los Palos Grandes?

TOP COMUNICATIONS ESTEGIA C.A..

Data centers near Caracas

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.