Data Center Directory

Tsvetochnaya Data Center

Tsvetochnaya Data Center is an operational data center operated by Selectel in St. Petersburg, Russia. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorSelectel
Facility power13 MW (range 6.4 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,143 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks49 networks, 8 internet exchanges
PeeringDB.
Also known asSelectel
AddressTsvetochnaya 19+21
Coordinates59.88723, 30.32910
Websiteselectel.ru

Power and grid

Nearest high-voltage substationЭлектросила, 110 kV, 800 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationЭС-1 Центральной ТЭЦ, 220 kV, 2.1 km away
HV substations within 10 km71
Power plants within 50 km5.2 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature4.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.4 °C (2001 to 2025)
Cooling degree days57 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Tsvetochnaya Data Center use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Tsvetochnaya Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Электросила (110 kV), about 800 m away.

How clean is the power for Tsvetochnaya Data Center?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Who operates Tsvetochnaya Data Center?

Selectel.

Data centers near St. Petersburg

More Selectel data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.