Tsvetochnaya Data Center
Tsvetochnaya Data Center is an operational data center operated by Selectel in St. Petersburg, Russia. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Selectel |
| Facility power | 13 MW (range 6.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,143 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 49 networks, 8 internet exchanges PeeringDB. |
| Also known as | Selectel |
| Address | Tsvetochnaya 19+21 |
| Coordinates | 59.88723, 30.32910 |
| Website | selectel.ru |
Power and grid
| Nearest high-voltage substation | Электросила, 110 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ЭС-1 Центральной ТЭЦ, 220 kV, 2.1 km away |
| HV substations within 10 km | 71 |
| Power plants within 50 km | 5.2 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 4.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.4 °C (2001 to 2025) |
| Cooling degree days | 57 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.57 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tsvetochnaya Data Center use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Tsvetochnaya Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Электросила (110 kV), about 800 m away.
How clean is the power for Tsvetochnaya Data Center?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates Tsvetochnaya Data Center?
Selectel.
Data centers near St. Petersburg
- TimeWeb DataCenter (SPb) 71 m
- CHTP 1.1 km
- IVC ORW Saint-Petersburg 2.7 km
- RETNNet OV DC 3.2 km
- Comlink Telecom 3.4 km
- РетнНет 3.4 km
- IMAQLIQ Data Center 4.1 km · 212 MW
- Data-Center IMAQLIQ 4.3 km
More Selectel data centers
- Berzarina Data Center Russia
- Селектел "Дубровка" Russia
- Selectel data center in Korolev Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.