TU Dresden AlphaCentauri
TU Dresden AlphaCentauri is an operational AI data center operated by Technische Universität Dresden in Dresden, Germany. Its power is about 0.3 MW. Epoch AI estimates about 86 H100-equivalent AI chips (NVIDIA A100 SXM4 40 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Technische Universität Dresden |
| Facility power | 0.3 MW Reported (Epoch AI or owner data) |
| AI compute | 86 H100-equivalents |
| AI chips | NVIDIA A100 SXM4 40 GB Reported (Epoch AI or owner data) |
| Chip count | 272 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 120 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Dresden, Germany |
| Coordinates | 51.04907, 13.73869 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 154 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| TU Dresden AlphaCentauri | NVIDIA A100 SXM4 40 GB | 272 | 0.3 MW | 2021-02-28 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TU Dresden AlphaCentauri use?
Public data puts the facility power at about 0.3 MW. Reported (Epoch AI or owner data).
What chips does TU Dresden AlphaCentauri use?
Reported chips: NVIDIA A100 SXM4 40 GB.
How clean is the power for TU Dresden AlphaCentauri?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates TU Dresden AlphaCentauri?
Technische Universität Dresden.
Data centers near Dresden
- Kraftwerk Mitte Dresden 1.2 km
- euNetworks Colocation Dresden 1.2 km
- DataCenter Dresden Reick 4.4 km
- Collocation Washingtonstraße Dresden 4.6 km
- EXA Edge DC Dresden 4.7 km
- IBH Dresden C2 5.1 km
- NTT DATA Business Solutions Global Managed Services 45.4 km · 4.3 MW
- Hochschulrechenzentrum 85.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.