US Bank Building
US Bank Building is an operational data center operated by Kiemle & Hagood in Spokane, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Kiemle & Hagood |
| Networks | 18 networks, 2 internet exchanges PeeringDB. |
| Also known as | Neutron - Spokane |
| Address | 428 West Riverside |
| Coordinates | 47.65814, -117.41930 |
| Website | neutroncolocation.com |
Power and grid
| Nearest high-voltage substation | Metro Substation, 115 kV, 500 m away (Avista) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Beacon Substation, 230 kV, 6.1 km away |
| HV substations within 10 km | 16 |
| Utility | Modern Electric Water Company (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | AVA |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 9.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 773 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.9 °C (2001 to 2025) |
| Cooling degree days | 241 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is US Bank Building to the power grid?
The nearest high-voltage substation in OpenStreetMap is Metro Substation (115 kV), about 500 m away. The local utility is Modern Electric Water Company, in the AVA balancing area.
How clean is the power for US Bank Building?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates US Bank Building?
Kiemle & Hagood.
Data centers near Spokane
- Lumen 438 m · 2.2 MW
- Iron Mountain 11.3 km · 1.2 MW
- TierPoint 24.3 km · 1.2 MW
- TierPoint Spokane 24.6 km
- Neutron - Coeur d'Alene 47.0 km
- CRALIDXX - Coeur d'Alene Central Office 47.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.